Free live masterclass · The Defensible Programme

Build a P6 programme that stands up to scrutiny.

A free five-hour live Primavera P6 masterclass. Build the Vanguard Footbridge programme with us, watch it go up in 3D and keep the files.

  • Sat 7 Nov
  • 9:00am GMT
  • Live on Zoom
  • Free · 100 live seats

Saturday 7 November · Live on Zoom

Grab your seat for Saturday

Project
TT-P6-FREE
Data date
07-Nov-26 09:00
Calendar
GMT · Live online

A free, five-hour live masterclass for planners, schedulers and project controls professionals. Build a complete Primavera P6 programme for the Vanguard Footbridge from a one-page brief, watch it go up in a 3D model, then find out why six days late on the steel costs four weeks.

When
Saturday 7 November 20269:00am – 2:00pm GMT (UK time)
Where
Live on ZoomJoining link sent by email
Cost
FreeLive seats capped at 100
Level
Beginner to intermediateExperienced planners welcome
Starts in 18days 00hours 00mins
Reserve my free seat Meet the project you'll build

Free · No card details needed

Reserve your free seat

Sat 7 Nov · 9:00am GMT · Live on Zoom

We'll use your details to send your joining link, reminders and the follow-up pack. Read our privacy notice.

Why it matters

A programme is a contract document. Reviewers read it like one.

¼

of the Price for Work Done to Date is retained until a first programme showing the required information is submitted, where none is identified in the Contract Data.

NEC4 ECC · clause 50.5

2weeks

for the Project Manager to accept a submitted programme or give reasons for not accepting it.

NEC4 ECC · clause 31.3

14

checks in the DCMA 14-Point Assessment, the schedule health test many reviewers run first.

DCMA 14-Point Assessment

The build

Five steps from brief to a programme that holds up

Every step happens live in Primavera P6, in this order, on Saturday. Times are UK time (GMT).

  1. 1Brief and work breakdown structure09:35
  2. 2Calendars and the 35 activities10:05
  3. 3Logic and the road-closure constraint10:45
  4. 4Float and the critical path12:00
  5. 5What-if and the DCMA 14-point check12:40

Meet the project

The Vanguard Footbridge: you'll build it, schedule it and watch it go up

A 38 m steel footbridge lifted over a busy dual carriageway in a single weekend road closure. It's small enough to build live in five hours and real enough to teach calendars, logic, constraints, float and delay.

3D model of the site in week 15: both abutments built beside the dual carriageway, with the future bridge shown as a faint outline
Week 15The abutments risePiles, pile caps and abutments go in while the truss is fabricated off site.
3D model of the lift weekend: a mobile crane swings the steel truss across the closed road
Week 22The lift weekendThe road closes and a 350 t crane lifts the whole span in one piece. Miss this date and the next closure is four weeks away.
3D model of the finished footbridge with stair towers, trees and people walking across
Week 28Open to the publicDeck, glazed parapets, lighting and landscaping complete, on one critical path.
Activities
35
Relationships
49
Calendars
2
Road closures you can miss
0

Everyone who registers gets the practice pack: the finished P6 file (XER), a workbook with exercises and answers, and the interactive 3D model.

Who it's for

For anyone who builds, reviews or relies on a programme

  • A piling crew in orange PPE beside a bored piling rig on the Vanguard Footbridge siteStarting out

    Aspiring planners

    Engineers, quantity surveyors and site staff moving into planning who want the P6 skills employers test at interview.

  • Two engineers reviewing footbridge drawings at a desk, with the 3D model on a screen behind themBuilding

    Planners and schedulers

    You build programmes every week and want them accepted first time, with fewer comments and resubmissions.

  • The Vanguard Footbridge site from the air in week 20, with both abutments beside the dual carriagewayReviewing

    Project controls teams

    You review contractor programmes and need to spot weak logic, hidden float and unrealistic dates quickly.

  • A site team assembling the blue steel truss on trestles at sunsetOwning

    Project managers

    You own the programme and want to read float and the critical path with confidence, without waiting for a planner to translate.

What you'll learn

By the end of the session you'll be able to

Practical habits you can use on Monday morning, on whatever programme you're working on.

  • Turn a one-page project brief into a WBS, two calendars and 35 activities in P6.
  • Write logic that holds, including a justified lag, resource logic and a date constraint.
  • Read total float and the critical path, and explain how a constraint can hide float.
  • Test a delay and show why six days late on the steel costs four weeks.
  • Run a DCMA 14-point check and explain the exceptions instead of hiding them.
  • Know what an NEC4 Project Manager checks under clause 31 before accepting a programme.

The programme

Five hours, scheduled the way you'll learn to schedule

Here's the session laid out in P6: 9:00am to 2:00pm GMT, with a half-hour break. Select an activity to read its notebook.

Layout: Classic Schedule Layout Filter: All Activities Duration format: minutes
Data date: 07-Nov-26 09:00

09:00 – 14:00 GMT · total float 0 on every activity

TT-P6-FREE The Defensible Programme 300 09:00 0 09:00–14:00 · 300 min

General

A1080What-if: the steel arrives late

Original duration
20 min
Start – finish
15:50 – 16:10
Total float
0 min · critical

Relationships

Predecessor
A1070 · FS
Successor
A1090 · FS

Notebook

Delay the steel by four days, then six, and watch the lift miss its road closure and opening slip by four weeks.

Critical activity WBS summary Level of effort Milestone Finish-to-start

Total float is zero on every activity. Please don't be late.

Your host

Dr. Adesegun Francis Osadare

Dr. Osadare is the founder of The True Troop Consulting Ltd, a project management consultancy specialising in construction scheduling and delay analysis. Alongside consultancy work, Dr. Osadare teaches the Primavera P6 Masterclass, publishes P6 and earned value tutorials on the TrueTroop PM Consulting YouTube channel, and wrote The A to Z of Project Scheduling.

Training in construction law and adjudication shapes the teaching. Every technique in this session is taught with one test in mind: will this programme hold up when someone challenges it?

PMP
Project Management Professional, PMI
PMI-RMP
Risk Management Professional, PMI
LLM
Construction Law and Adjudication
MSc
Project Management
Author
The A to Z of Project Scheduling
Founder
The True Troop Consulting Ltd

Grounded in recognised practice

Real contracts. Real scrutiny.

The techniques in this session line up with the guidance that clients, reviewers and adjudicators rely on.

  • 14-Point Schedule AssessmentDefense Contract Management Agency (DCMA)
  • NEC4 ECC clauses 31, 32 and 50.5NEC4 Engineering and Construction Contract
  • Guide to Good Practice in the Management of Time in Major ProjectsChartered Institute of Building (CIOB)
  • Delay and Disruption Protocol, 2nd editionSociety of Construction Law (SCL)
  • RP 29R-03 Forensic Schedule AnalysisAACE International
  • Practice Standard for SchedulingProject Management Institute (PMI)
The dual carriageway closed at night for the lift, with road-closed barriers and the crane under floodlights
Lift weekend · AI illustration
6 dayslate on the steel costs four weeks when the road closure is missed. You'll see why live.

Once you've registered

What happens next

  1. Straight away

    Confirmation email

    Your Zoom joining link arrives within a few minutes. Check spam if you can't see it.

  2. Thursday, Saturday morning and 15 minutes before

    Three reminders

    Short reminders so the session doesn't slip off your radar in a busy week.

  3. Sat 7 Nov · 9:00am GMT

    Join live

    Open the link on a laptop, tablet or phone. You don't need P6 installed to take part.

  4. After the session

    Practice pack

    The Vanguard Footbridge P6 file, the workbook with exercises, the 3D model and a replay link for 48 hours.

Questions

Frequently asked questions

Can't see your question? Email support@thetruetroop.com and we'll get back to you.

Is it really free?

Yes. There's no charge and no card details. In the final part of the session Dr. Osadare explains how the Vanguard cohort of the Primavera P6 Masterclass works, for anyone who wants to go further. There's no obligation.

Do I need Primavera P6 installed?

No. You can watch, take notes and still get full value. If you have P6 Professional or P6 EPPM, you can build along with us, and everyone gets the finished project file (XER) afterwards. There's a Microsoft Project version too.

What is the Vanguard Footbridge?

A fictional but realistic sample project: a 38 m steel footbridge lifted over a dual carriageway in one weekend road closure. We use it to build, schedule and stress-test a programme live, and you keep the files.

I'm new to planning. Will I keep up?

Yes. The session starts from first principles and builds up. Experienced planners tend to get the most from the float, baseline and DCMA segments.

What time is it where I am?

The masterclass is on Saturday 7 November, 9:00am – 2:00pm GMT (UK time). UK clocks go back on Sunday 25 October, so the UK will be on GMT, not BST.

CityStart timeDay
London09:00Sat 7 Nov
Lagos10:00Sat 7 Nov
Accra09:00Sat 7 Nov
Johannesburg11:00Sat 7 Nov
Riyadh12:00Sat 7 Nov
Dubai13:00Sat 7 Nov
Mumbai14:30Sat 7 Nov
New York04:00Sat 7 Nov
Will there be a replay?

Yes. Everyone who registers gets a replay link by email, available for 48 hours, along with the practice pack. The live Q&A only happens live, so join in person if you can.

How do I join on the day?

Use the Zoom link in your confirmation email. You can join from the Zoom app or a web browser on a laptop, tablet or phone. If the email hasn't arrived, contact support@thetruetroop.com.

What do you do with my details?

We use your name and email to send your joining link, reminders and the follow-up pack. We only send other emails if you tick the box to say yes, and you can unsubscribe at any time. Your details are handled in line with UK GDPR. Read our privacy notice.

Saturday 7 November. Five hours. Free.

Build the Vanguard Footbridge with us, keep the files, and leave with habits that make your programmes easier to build, review and defend.

Vanguard Footbridge · AI illustration

Reserve my free seat 07-Nov-26 09:00 GMT · Zoom · Free